Letting agent portfolio handover playbook EICR reports

EICR for Letting Agents in Cirencester

EICR guidance for letting agents in Cirencester: portfolio records, tenant access, report deadlines and remedial follow-up before booking an inspection.

Start an EICR booking for a managed rental with the report folder, not just the diary. Check the existing outcome, any outstanding action and the next inspection date. A change of tenant does not automatically mean a fresh inspection where the current evidence remains sufficient. Missing reports, overdue dates and unresolved safety work need different responses.

For Cirencester letting agents, the practical job is to connect the landlord’s instruction, the occupier’s access arrangements and the electrician’s complete report. JI Electrical provides EICRs for landlords and properties in the Cotswolds. This guide sets out a booking and handover checklist; agree Jack’s actual availability, scope and delivery arrangements directly.

Sort the portfolio into actions, not colour-coded assumptions

Keep one record per installation or clearly defined inspection scope. A folder labelled “electrical certificate” is not enough: identify the document, property, date, outcome and recommendation. An invoice proves a purchase, not the condition of the installation. A booking confirmation proves an appointment, not that inspection or required work has been completed.

What the file showsNext actionWhat closes the task
Current satisfactory report, no outstanding required workCheck the next inspection date and any subsequent damage or alterations; arrange tenant delivery.Complete report retained, delivery recorded and next date scheduled.
Report missing, incomplete or past its next inspection dateSeek the original documents promptly; arrange inspection if sufficient evidence cannot be established.Complete current evidence reviewed, not simply an appointment booked.
C1, C2 or required investigation recordedEscalate the actual risk and report deadline; agree the required action with a qualified person.Appropriate completion records and required distribution, not only a paid invoice.
Tenant access not agreedRecord reasonable attempts and escalate to the landlord through the proper process.Access achieved or a properly evidenced response to the difficulty.
New tenancy, existing report availableCheck whether it remains sufficient and supply it before occupation.Evidence reviewed and delivered, with any necessary action resolved.

Do not batch every address under the date of the newest report. Different properties can have different inspection recommendations and unresolved observations. Use the landlord EICR guide for the wider duties and the unsatisfactory-report action plan when the priority is follow-up rather than another routine booking.

Check the report date before ordering another inspection

Regulation 3 of the rented-sector electrical safety regulations requires inspections at intervals of no more than five years, or sooner where the previous report specifies a shorter interval. Enter that actual next date in the register. Do not replace it with a generic five-year reminder.

The current government guidance for England says re-letting does not itself require another inspection where the existing report remains sufficient and no required work is outstanding. It recommends a visual check before a new tenancy and earlier inspection if there are concerns. Do not dismiss reported damage because the document has time left.

Ask about electrical alterations since the last report. Keep installation certificates alongside it, rather than assuming they cover the whole home. The guide to certificates after a rewire explains the distinction between a condition report and records for completed installation work. A partial alteration is not automatically a replacement for the property’s EICR.

White electric radiator in a WC with a cable to a grey connection plate and surface trunking on the wall
A fixed heater connection from Jack’s own photographs. Record fixed equipment when describing the installation; this image is not evidence of a rental inspection or its result.

Send a useful brief for each property

Give the electrician enough information to define the work before discussing a combined diary. A compact property schedule is more useful than forwarding an entire tenancy file. Include the address, property type, approximate size, occupancy, existing report and deadline. Identify multiple consumer units, outbuildings or specialist systems if known, without trying to diagnose them.

State who can authorise the booking, who will pay and who receives the report. Agree whether the landlord requires approval before any separate investigation or remedial work. An agency spending limit should be explicit; it should not be inferred from permission to inspect. The electrician also needs a reliable contact for urgent findings, rather than an unattended general inbox.

Ask for the inspection extent, known limitations, complete report and schedules, total payable, VAT treatment and exclusions in writing. Agree how a failed-access visit or return attendance would be handled. These are quotation questions, not promises of JI Electrical discounts, automatic repairs or an agency account. For price comparison, use the EICR cost and scope guide and ask Jack for a fixed quotation for the agreed work.

Separate the domestic installation from communal areas, commercial premises and specialist equipment. A flat’s report should not be assumed to cover a block’s shared distribution or stairwell lighting. Describe the boundaries and ask who needs to assess anything outside them. The Electrical Safety First landlord advice is a useful starting point for understanding fixed-installation safety and the separate responsibility for supplied equipment.

Where a managed property has charging equipment or planned refurbishment, keep the EV installation scope and older-home rewire plan separate from its routine inspection instruction.

Agree tenant access and possible interruptions

Ask what access and power interruptions the inspection is likely to require, then agree a suitable appointment with the occupier. Mention working from home, alarms, refrigeration and equipment that cannot simply be interrupted. Where someone depends on powered medical equipment, agree a suitable plan with the relevant people before attendance. Share the operational need rather than unnecessary medical history.

Make sure the agreed contact knows where keys are held and which rooms or cupboards are locked. Request safe, reasonable access to electrical points and the consumer unit. Do not ask the tenant to remove covers, expose wiring, open sealed supply equipment or move something they cannot safely handle. A neat photograph cannot prove that inspection access is adequate.

If the tenant declines access, keep dated communications, proposed appointments and the response. Escalate promptly through the landlord’s proper process. The government guidance recognises reasonable steps to comply, but a single unanswered message is not a compliance certificate. Do not force entry for a routine inspection or keep rolling the date forward without recording the problem.

The ICO’s data minimisation principle says personal information should be adequate, relevant and limited to what is necessary. Use the agreed contact route for access details. Keep keys, entry codes and private tenant information out of a broadly shared portfolio spreadsheet.

A workable inspection brief

Agree access and delivery together

Explain occupancy, known restrictions and the report deadline. Confirm the proposed arrangements before booking.

Ask for a quote
Call 07380 944864
Small furnished sitting room with exposed ceiling beams, wall lights, an armchair, fireplace and cleaning equipment
A furnished room from Jack’s uploaded photographs. Agree access to rooms and electrical points in advance without asking occupiers to dismantle equipment.

Read the complete report before closing the booking

On receipt, match the address and inspection date to the instruction. Read the overall assessment, observations, extent, limitations and recommended next date. Check that the relevant schedules are present. The IET model forms show how an EICR and its inspection and test information fit together. A single page saying “satisfactory” is not a substitute for the complete record.

Look for unexplained restrictions. If a room, circuit or system was outside the agreed extent, ask what that means for the property file and whether another appointment or specialist assessment is needed. Do not rewrite the inspector’s conclusions or treat an inaccessible circuit as checked. The home buyer inspection guide covers why extent and limitations matter when the person ordering the report is not living there.

C1 means danger present and C2 means potentially dangerous. C3 is an improvement recommendation and does not alone make a report unsatisfactory. The EICR code guide gives more detail. Prioritise the actual observation and instruction, rather than asking for a board replacement purely because equipment looks old. The fuse-box assessment guide explains that distinction.

Edition matters in October 2026. The IET edition checker identifies 15 October 2026 as the end of the earlier amendment’s transition. Its Amendment 4 explanation of FI changes the wording to “further investigation is advised” and separates FI from the unsatisfactory outcome driven by C1 or C2. Current government rented-sector guidance still requires identified necessary investigation. Ask the inspector what the finding requires; do not silently close FI because a form’s wording changed.

Track the distribution clocks separately

Under regulation 3, existing tenants must receive the report within 28 days of inspection and testing. A new tenant must receive it before occupation. A prospective tenant requesting it must receive a copy within 28 days of the written request. The local council must receive a copy within seven days of its written request. These are different triggers, so a single “report sent” tick is too vague.

Record the recipient, date, document version and delivery method. Keep the complete report for the next inspection and make it available to the next inspector. Suggested register columns are property reference, report date, outcome, next inspection date, required action, action owner, deadline, completion evidence and delivery dates. Limit access to people who need those records.

Necessary remedial or investigative work must be completed within 28 days of inspection and testing, or the shorter period specified in the report. Within 28 days after completion, supply the tenant and local council with the report and written confirmation of the work. Appropriate completion records depend on the work. Do not automatically demand another full EICR if the original report and suitable confirmation establish what was completed.

Keep recommendations separate from necessary safety action so optional improvements do not obscure deadlines. An electrician’s quotation, an agency approval and a paid invoice each have a place, but none alone proves the required work was completed. Ask a qualified person to explain any unclear observation and the evidence needed to close it.

Check property-specific duties and agree the next step

For an HMO, also review the licence and management requirements. Cotswold District Council’s HMO guidance covers the local route and supporting records. Communal electrical systems can need separate maintenance and assessment even where they sit outside a particular dwelling’s rented-sector inspection. Keep these responsibilities visible in the property brief.

To discuss an inspection with Jack, send a manageable property schedule, the previous complete reports, dates and known access restrictions. Agree the inspection scope, quotation, occupier arrangements and report delivery before confirming attendance. Use the electrician selection checklist when comparing evidence and written scopes, then contact JI Electrical about the properties concerned.

Customer reviews

What customers say about Jack

Jack did a great job installing new spotlights in our kitchen. He turned up on time, worked efficiently, and everything was finished to a really high standard.

Alex RGoogle review

Jack and his colleague Freddie arrived on time, worked efficiently, and everything was completed to a really high standard. The price was fair and they left everything clean and tidy afterwards.

Finley ThompsonGoogle review

I contacted JI Eletrical within 24hrs with an issue and they came to fix it quickly and not had a problem since!

Milly PotterGoogle review

Read more Google reviews

Quick answers

Letting agent EICR questions

Does every new tenancy need a new EICR?

No. A repeat inspection is not automatically required where the existing report remains sufficient, its next inspection date has not passed and no required investigation or remedial work is outstanding. Give the new tenant the report before occupation and consider condition changes.

Can a letting agent arrange an EICR for the landlord?

An agent can coordinate the booking under its agreed authority. Confirm who orders and pays for the inspection, receives the complete report and manages follow-up. This does not remove the landlord’s statutory duties.

When must tenants receive the report?

Existing tenants must receive the report within 28 days of inspection and testing. New tenants must receive it before occupation. Prospective tenants who request it must receive a copy within 28 days of the request.

What happens if an occupier refuses access?

Keep evidence of reasonable attempts to arrange access and escalate through the landlord’s proper process. Government guidance recognises reasonable steps, but one unanswered message does not establish compliance. Do not force entry for a routine inspection.

Does JI Electrical publish portfolio discounts or guaranteed report turnaround?

No portfolio price or guaranteed turnaround is stated in this guide. Ask Jack to confirm the quotation, access arrangements and report delivery for the properties concerned before booking.

Sources

Guidance checked 14 October 2026. This is a practical guide for private rented homes in England; apply the actual report and property requirements.

EICRs in Cirencester

Discuss your managed properties with Jack.

Contact JI Electrical with the addresses, existing records and due dates. Ask for a fixed quote for the agreed inspection work.

Ask for a quote Call 07380 944864 Discuss EICRs for managed rental properties