Cost ranges and job-scope ladder Cost guides

Electric Shower Installation Cost in Cirencester

What fitting an electric shower costs: market ranges from named UK guides with VAT noted, what the circuit needs and when Part P applies, for Cirencester homes.

Three UK cost guides checked for this article put the labour to fit an electric shower on an existing electrical supply at roughly £80 to £300, or £250 to £450 where a mid-range unit is supplied, and a brand-new installation with a new circuit at £400 to £700 or more before the unit is added. Bought separately, the shower itself is about £50 to £300 in the same guides. These are market ranges from other publishers, not a JI Electrical price.

This guide reflects the cost pages, manufacturer instructions, legislation and Approved Document checked on 5 November 2026. It covers dwellings in England, which includes Cirencester. None of the cost guides is specific to Cirencester, so treat every figure as a budgeting range, then ask Jack whether he fits electric showers and for a fixed quotation for your bathroom.

What published guides say an electric shower costs

Three UK guides were opened and read for this article. They price different jobs and treat VAT differently, so the table keeps each figure with its publisher, its date and what it says it covers.

JobPublished rangePublisher and what it says
Like-for-like swap, same kW£120 to £250 labourTrade2Base, 14 June 2026. VAT not stated
Replacing an existing shower£80 to £160 labourHamuch, updated 4 March 2026. Says its location estimates exclude VAT; it does not say whether this range includes it
Fitting, rest of the UK£150 to £300Fantastic Services, 2026 (no exact date). Says fitting figures include VAT
Supply and fit, mid-range unit, existing supplies£250 to £450Trade2Base: the unit is included in this row
Typical supply and fitAbout £320Hamuch: installation labour alone is given as £200
Brand-new install, new circuit and water supply£400 to £700 or moreTrade2Base: unit added at £60 to £250
Professional installation, all jobs£200 to £800Hamuch: depends on the unit
The shower unit alone£50 to £300Fantastic Services, including VAT. Trade2Base gives £60 to £250; Hamuch says from £75, with luxury models £500 or more
Electrician's day rate£200 to £300Trade2Base

Read the table as a spread, not a quote. Trade2Base, Fantastic Services and Hamuch do not agree to the pound, and only Fantastic Services says its fitting figures include VAT. Ask any installer to state VAT on the quotation, and to say whether the shower is supplied or you are buying it.

How to read those figures

Two traps are easy to fall into. First, the rows are not like for like: Trade2Base’s £250 to £450 includes the unit, while its £120 to £250 swap is labour only. Hamuch’s £200 labour and £320 supply and fit show the same gap between labour-only and supplied. Compare a quotation against the row that matches what it covers.

Second, the cheap rows assume the wiring is already there. Fantastic Services says that if a new circuit has to be run back to the consumer unit, “that adds noticeably to the cost”, but gives no figure. Trade2Base’s £400 to £700 or more for a new circuit and water supply is the only published number among the three, and it is one publisher’s estimate. Hamuch lists cable runs from the consumer unit, chasing walls, lifting flooring and plumbing as extras on top.

On location, Fantastic Services puts London and the South East about 15 to 30 per cent above the North of England, Wales and Scotland, with fitting at £180 to £360 there against £150 to £300 elsewhere. Cirencester is outside London and the South East, so the lower band is the closest published match, but no guide here prices Cirencester itself.

Finished shower room with a glass shower enclosure, black shower fittings, a wash basin and mirror, a ceiling downlight and an extractor
A finished shower room from JI Electrical's project photographs, shown to illustrate the room. The photo does not say what type of shower is fitted.

Which job are you pricing?

  1. 1
    Swapping an old shower for the same rating

    The cheapest case in every guide, because the cable, protection and isolator are already in place. Trade2Base gives 1 to 2 hours and Hamuch 2 to 3 hours. Ask the installer to check that the existing cable and protective device suit the new unit.

  2. 2
    A higher-kW unit on the existing circuit

    Trade2Base says a higher-rated unit may need thicker cable, often 10mm². If the old circuit is too small, the job moves to the next rung, so ask for that possibility to be stated on the quotation.

  3. 3
    A new electric shower where there was none

    This needs its own circuit from the consumer unit, a local isolator and RCD protection, per Trade2Base, plus a water supply. Trade2Base calls it most of a day, and Fantastic Services says a day or more with new cabling.

  4. 4
    A new circuit and a consumer unit with no room for it

    The added demand has to be checked at the board. The Mira installation guide quoted below says the supply company fuse and consumer unit must be adequate for the additional demand. See our consumer unit replacement cost guide if a new board is on the table.

What the shower needs from the circuit

Cost guides rarely say what an electric shower asks of the wiring. The clearest published answer is a manufacturer’s installation guide. The Mira Sport installation and user guide lists, for that one model, a recommended breaker for each rating:

Mira Sport variant (at 240 V)Power at 230 VRecommended MCB
7.5 kW6.9 kW32 A
9.0 kW8.3 kW40 A
9.8 kW9.0 kW45 A
10.8 kW9.9 kW45 A

The same guide gives a recommended 30 mA RCD, a recommended 45 A double-pole isolator switch with 3 mm contact separation, and a maximum supply cable size of 16mm². It says the shower needs a separate supply from the consumer unit, must not feed other equipment such as an extractor fan or pump, and that the electrical installation must comply with BS 7671. The isolator can be a ceiling pull-cord inside the shower room or a wall switch in the applicable zone.

These are one manufacturer’s figures for one range, not a rule for every shower, so the instructions in your own box and the installer’s own calculation govern. On cable, Commercial Washrooms suggests 6mm² for 6 to 7 kW, 10mm² for 7.5 to 10 kW and 16mm² for 10.5 to 11 kW, while pointing readers to the manufacturer’s instructions for an exact guide. Mira gives only a maximum, so the guides leave the minimum to the person designing the circuit. That is a reason to ask what cable and breaker are being quoted, not to buy cable yourself.

Before you compare prices

Ask what the quote covers.

A clear quote names the shower, the circuit, the isolator, the certificate and VAT, so two prices can be compared fairly.

Ask for a quote
Call 07380 944864

When a shower job is notifiable under Part P

Regulation 12(6A) of the Building Regulations 2010 makes three kinds of work notifiable in England: a new circuit, a consumer unit replacement, and any addition or alteration to existing circuits in a special location. Approved Document P adds that all other installation work is not notifiable, naming replacements, repairs and maintenance anywhere.

Shower jobNotifiable in England?Why
Replacing a shower on its existing circuitNoA replacement, not a new circuit. A bigger circuit would be a different job
A new shower circuit from the consumer unitYesIt is a new circuit
Adding to or altering an existing circuit inside the bath or shower special locationYesAlteration to an existing circuit in a special location
Replacing the consumer unit to make room for the showerYesConsumer unit replacement

Regulation 12(9) defines the special location in a room with a bath or shower as the space around the bath tap or shower head, up to 2.25 metres from the floor and 0.6 metres out from the edge of a bath or shower tray, or 1.2 metres from the centre of the shower head where there is no tray. Approved Document P also notes that socket-outlets should not be located within 3 metres of a bath tub or shower tray.

Distribution board with its cover off, breakers with colour-coded cables dressed in to each side and a meter below
A distribution board with its cover off, from JI Electrical's project photographs. It shows the board end of a circuit, not a shower installation.

GOV.UK lists changing electrics near a bath or shower among alterations that may need approval, and says you do not need to get approval yourself if you use someone registered with a competent person scheme. Approved Document P says registered installers should complete a BS 7671 electrical installation certificate for every job and give it to the person ordering the work. Our Part P certificate guide covers the routes and the paperwork, and electrical certificates explains what each document means. Ask any installer, Jack included, which route they use before work starts.

What a fair electric shower quotation should say

  1. 1
    Supplied or fitted only

    Say who buys the shower and which rating it is. The price range for the unit alone is £50 to £300 in the guides above, so a quotation that leaves it out is not comparable with one that includes it.

  2. 2
    Existing circuit or new circuit

    State which, and name the cable and breaker. If the existing circuit is checked and reused, the quotation should say what was checked.

  3. 3
    Isolator and RCD protection

    Ask for the local isolator and the RCD protection to be listed rather than assumed.

  4. 4
    Certificate and notification

    State which certificate you will receive and who notifies building control where the job needs it.

  5. 5
    Plumbing, making good and VAT

    Hamuch says one professional, an electrician or a Part P certified plumber, can handle both the electrical and plumbing work. Agree who does what, who makes good chased walls or lifted floors, and whether VAT is included.

If the shower is part of a bathroom refit, price the electrics together: the cable runs overlap with lights and extractor fans. See the LED downlight cost ranges and the extra sockets guide for the neighbouring jobs, electrician call-out charges for why a small job can cost more than its size suggests, and seven checks before choosing an electrician for comparing quotations. When you contact Jack, say whether you are replacing a shower or adding one, the kW rating on the box if you have it, how old the consumer unit is and where the board is in relation to the bathroom, and ask for a fixed quotation. If the board is old, does my fuse box need replacing? sets out the signs to assess first. You can also see the services listed on the site.

Customer reviews

What customers say about Jack

Jack did a great job installing new spotlights in our kitchen. He turned up on time, worked efficiently, and everything was finished to a really high standard.

Alex RGoogle review

Jack and his colleague Freddie arrived on time, worked efficiently, and everything was completed to a really high standard. The price was fair and they left everything clean and tidy afterwards.

Finley ThompsonGoogle review

I contacted JI Eletrical within 24hrs with an issue and they came to fix it quickly and not had a problem since!

Milly PotterGoogle review

Read more Google reviews

Electric shower questions

How much does it cost to have an electric shower fitted?

Published UK guides give about £80 to £250 labour for replacing a shower, £150 to £450 to fit one on existing wiring depending on whether the unit is included, and £400 to £700 or more for a new circuit and water supply. Where it is not included, the unit is about £50 to £300. These are market ranges, not a JI Electrical price.

How long does the job take?

Trade2Base gives 1 to 2 hours for a like-for-like swap and most of a day for a brand-new install. Hamuch gives 2 to 3 hours for a replacement and up to a day with new wiring. Fantastic Services says new cabling can take a day or more.

Does an electric shower need its own circuit?

The Mira Sport guide says the shower needs a separate supply from the consumer unit and must not feed other equipment such as an extractor fan. Trade2Base says a new install needs a dedicated circuit, an isolator and RCD protection.

Is fitting an electric shower notifiable under Part P?

A new circuit is notifiable in England, as is any addition or alteration to an existing circuit inside the bath or shower special location. Replacing a shower on its existing circuit is a replacement and is not notifiable under Approved Document P.

What certificate should I get?

Approved Document P says registered installers should complete a BS 7671 electrical installation certificate for every job and give it to the person ordering the work. Ask which scheme the installer uses before work starts.

Can one tradesperson do the plumbing and the electrics?

Hamuch says one professional, an electrician or a Part P certified plumber, can handle both. Agree in writing who does the plumbing, who makes good and whether VAT is included.

Sources checked on 5 November 2026

The cost figures are other publishers' market ranges. They are not a JI Electrical price.

A bathroom to plan

Send Jack the details of the job.

Include the shower rating, the age of the consumer unit and a photograph of the board, and ask whether he fits electric showers.

Ask for a quote Call 07380 944864 Ask Jack about fitting an electric shower