A new borehole near Yate, Bristol, needed an electrical supply and controls for its pumps. JI Electrical arranged the trenching alongside the borehole contractor, then installed the cable and the controls.
“Supplies and controls installed for a new borehole near Yate, Bristol. We arranged the trenching for these works alongside our borehole contractor. We laid over 500m of armoured cabling to supply the borehole and installed all controls for borehole and booster pumps along with pressure switches and float switches.”
Jack Innes, on this job
What JI Electrical did
- Trenching arranged alongside the borehole contractor
- Over 500m of armoured cable laid to supply the borehole
- All controls for the borehole pump and booster pumps
- Pressure switches and float switches
Photos from the job






Electrical work near Yate, Bristol
The borehole is near Yate, about 23 miles in a straight line from Cirencester. Jack arranged the trenching with the borehole contractor, laid the cable and installed the controls, so one electrician covered the supply from end to end.
If you are planning a borehole, well or pump supply in or around Yate, tell Jack where the supply starts and where the pumps will go. He will explain the next step.
The map shows the town or area only, not the customer's address. Open in Google Maps.
Planning power for a borehole? Decide these first
A short list to settle with your electrician before work starts. Where this job shows how it was handled, it is noted.
| Decide this | Why it matters |
|---|---|
| How far is the borehole from the nearest supply? | Distance drives the cable size, the trenching and the cost. On this job the supply needed over 500m of armoured cable. |
| Who is digging the trench, and when? | The trench has to suit the cable and the drilling schedule. Here, Jack arranged the trenching alongside the borehole contractor. |
| What will the borehole pump and any booster pumps need? | Pump sizes decide the supply, the protection and the controls. This job had controls for the borehole pump and for booster pumps. |
| How should the pumps start and stop? | A pressure switch starts a pump when pressure in the pipework drops. A float switch responds to the water level in a tank. Both were installed here. |
| Where will the controls live, and how are they protected from weather? | Controls outdoors need a weatherproof enclosure. The photos show a control enclosure on timber posts beside a polytunnel, with a weatherproof socket on its side. |
| What paperwork do you need at the end? | Ask for the electrical installation certificate for the new supply. |
A supply that has to run a long way?
Get a quote from Jack
If you need power taken a long way across a site, tell Jack where it starts, where it needs to end and what it has to run. He will explain the next step.
- 1Call, message or email Jack
It goes straight to him. No forms, no middleman.
- 2Tell him the basics
The postcode or town, what the property or building is, and the work you need.
- 3Add what you have
Photos, plans, a previous certificate or report, and the date you need it done by.
Call 07380 944864WhatsApp JackEmail Jack
Prefer to write it yourself? Email jack@jielectrical.com, or use the contact page for every option in one place.
Guides that go with this job
Seven checks before booking an electrician in Cirencester: registration, written scope, insurance, Part P, certificates, access and quote changes.
What JI Electrical offers, how to brief Jack and what to expect from a quotation.
Questions about this job
What electrical work did a new borehole near Yate need?
JI Electrical arranged the trenching with the borehole contractor, laid over 500m of armoured cable to supply the borehole, and installed all the controls for the borehole and booster pumps, along with pressure switches and float switches.
How long was the cable run to the borehole?
Over 500m of armoured cable.
What are pressure switches and float switches for?
A pressure switch starts and stops a pump according to the water pressure in the pipework. A float switch responds to the water level in a tank. Both are used to run pumps automatically.
Does the electrician arrange the trenching for a long cable run?
On this job Jack arranged the trenching with the borehole contractor, so the cable route and the drilling worked together. Tell him about your site and he will explain who needs to do what.
How far is this job from JI Electrical's base?
About 23 miles in a straight line from Cirencester, where Jack is based. If your site is further away, tell him where it is and he will say whether he can take it on.
How do I get a quote for a borehole supply?
Call Jack on 07380 944864 or email jack@jielectrical.com with the location, the distance from the nearest supply and the pumps you plan to run. Photos of the site help.
More JI Electrical projects
Electrical installation for farm units near Tring, Bucksnear Tring, Bucks
Electrical installation for a new vet surgery in Wigginton, TringWigginton, Tring
House rewire in Chalford, near StroudChalford, StroudCustomer reviews
What customers say about Jack
Jack did a great job installing new spotlights in our kitchen. He turned up on time, worked efficiently, and everything was finished to a really high standard.
Jack and his colleague Freddie arrived on time, worked efficiently, and everything was completed to a really high standard. The price was fair and they left everything clean and tidy afterwards.
I contacted JI Eletrical within 24hrs with an issue and they came to fix it quickly and not had a problem since!